EXPRESS STEEL

Manual Concrete Bucket

For Skid Steers & Track Loaders

3/4-Cubic-Yard Capacity

Express Steel

Express Steel Manual Concrete Bucket

SKU: ES32040 Availability confirmed before order

Sale price$2,558.99 USD

MOST IMPORTANT FEATURES

3/4-CUBIC-YARD CAPACITY

THE BUCKET PROVIDES 3/4 CUBIC YARD OF HANDLING CAPACITY. LIMIT THE CONCRETE LOAD TO THE CARRIER’S RATED LIFTING CAPACITY.

MANUAL DISCHARGE CONTROL

THE BUCKET USES MANUAL DISCHARGE OPERATION. IT DOES NOT REQUIRE A HYDRAULIC MOTOR OR AN AUXILIARY HYDRAULIC CONNECTION FOR DISCHARGE.

11-INCH DISCHARGE CHUTE

AN 11-INCH CHUTE DIRECTS MATERIAL FROM THE BUCKET. THE CHUTE CROSS SECTION MEASURES 8.5 INCHES BY 8.5 INCHES.

3/16-INCH STEEL BODY

THE BODY IS MADE FROM 3/16-INCH STEEL. THE BUCKET MEASURES 60 BY 48 BY 19 INCHES OVERALL.

INTEGRATED TREADED STEP

A TREADED STEP IS BUILT INTO THE ASSEMBLY. CHECK THE STEP, DISCHARGE COMPONENTS, AND MOUNTING LOCKS BEFORE OPERATION.

Description

Key Benefits

Technical Specs

Applications

Express Steel Manual Concrete Bucket

The Express Steel Manual Concrete Bucket transports and places concrete with a matching loader. Its Universal skid steer quick attach interface connects to a matching loader.

The bucket provides 3/4 cubic yard of handling capacity. Limit the concrete load to the carrier’s rated lifting capacity. The bucket uses manual discharge operation. It does not require a hydraulic motor or an auxiliary hydraulic connection for discharge.

An 11-inch chute directs material from the bucket. The chute cross section measures 8.5 inches by 8.5 inches. The body is made from 3/16-inch steel. The bucket measures 60 by 48 by 19 inches overall.

A treaded step is built into the assembly. Check the step, discharge components, and mounting locks before operation. Choose a size and payload that stay within the carrier’s rated capacity, accounting for attachment weight, material density, and load position.

Express Steel Manual Concrete Bucket

  • The bucket provides 3/4 cubic yard of handling capacity. Limit the concrete load to the carrier’s rated lifting capacity.
  • The bucket uses manual discharge operation. It does not require a hydraulic motor or an auxiliary hydraulic connection for discharge.
  • An 11-inch chute directs material from the bucket. The chute cross section measures 8.5 inches by 8.5 inches.
  • The body is made from 3/16-inch steel. The bucket measures 60 by 48 by 19 inches overall.
  • A treaded step is built into the assembly. Check the step, discharge components, and mounting locks before operation.

Express Steel Manual Concrete Bucket

  • Brand: Express Steel
  • Product: Manual Concrete Bucket
  • Interface: Universal skid steer quick attach
  • Overall dimensions: 60 × 48 × 19 inches
  • Chute: 11 inches long; 8.5 × 8.5-inch cross section
  • ES32040: 465 lb; 0.75 cubic yard capacity

Express Steel Manual Concrete Bucket

  • Transporting and placing concrete with a matching carrier.
  • Controlled discharge into accessible forms and work areas.
  • Concrete placement within carrier lift and stability limits.

Express Steel: Bucket Demonstrations

Express Steel Manual Concrete Bucket

BUILT FOR THE WORK:

  • The bucket provides 3/4 cubic yard of handling capacity. Limit the concrete load to the carrier’s rated lifting capacity.
  • The bucket uses manual discharge operation. It does not require a hydraulic motor or an auxiliary hydraulic connection for discharge.
  • An 11-inch chute directs material from the bucket. The chute cross section measures 8.5 inches by 8.5 inches.
  • The body is made from 3/16-inch steel. The bucket measures 60 by 48 by 19 inches overall.
  • A treaded step is built into the assembly. Check the step, discharge components, and mounting locks before operation.

SET UP FOR YOUR APPLICATION:

  • Transporting and placing concrete with a matching carrier.
  • Controlled discharge into accessible forms and work areas.
  • Concrete placement within carrier lift and stability limits.
  • Mount: Universal skid steer quick attach.
  • Match working width and payload to the loader and worksite.

READY FOR THE FIELD:

  • Inspect the body, working edges, mounting plate, and retaining hardware.
  • Engage the carrier’s attachment locks before working.
  • Account for bucket and payload weight within the carrier’s rated capacity.
  • Keep the work area clear and carry loaded attachments low during travel.
  • Clean the bucket and chute before concrete hardens.

You may also like