MOST IMPORTANT FEATURES
3/8 IN. STEEL CONSTRUCTION
THE BUCKET IS CONSTRUCTED FROM 3/8-INCH STEEL.
OPEN TINE FLOOR FOR SOIL SEPARATION
AN OPEN FLOOR LETS LOOSE SOIL FALL THROUGH WHILE LARGER ROCKS REMAIN IN THE BUCKET.
3-3/8 IN. TINE SPACING
TINE SPACING IS 3-3/8 INCHES. THIS SPACING AFFECTS WHICH MATERIAL FALLS THROUGH DURING SORTING.
TREADED ENTRY STEP
THE TREADED STEP PROVIDES A FOOTHOLD FOR LOADER CAB ACCESS.
MULTIPLE WORKING WIDTHS
CHOOSE A WORKING WIDTH THAT SUITS THE LOADER, ACCESS AREA, AND MATERIAL-HANDLING TASK.

Loflin Fabrication: Bucket Demonstrations & Brand Videos
Loflin Rock Bucket
BUILT FOR THE JOB:
CONTROLLED MATERIAL HANDLING:
READY FOR THE FIELD:

