MOST IMPORTANT FEATURES
FILL-LEVEL MARKERS
INTERNAL METAL MARKERS SHOW THE FILL LEVEL TO HELP GAUGE THE LOAD BEFORE TRANSPORT.
REINFORCED CORNERS
REINFORCED CORNERS SUPPORT THE BUCKET AT THE JUNCTIONS OF ITS FLOOR AND SIDE WALLS.
MATERIAL HANDLING
VIRNIG CONCRETE BUCKET CARRIES AND POURS CONCRETE AND OTHER FREE-FLOWING MATERIALS.
BATCH CAPACITY OPTIONS
CHOOSE A ½ OR ¾ CU. YD. MAXIMUM-CAPACITY BUCKET TO MATCH THE BATCH AND CARRIER.
WIDTH OPTIONS
TWO BUCKET SIZES OFFER DIFFERENT WIDTHS FOR MATCHING THE LOAD AND WORKING AREA.

VIRNIG CONCRETE BUCKET
WORKING DESIGN
CONFIGURATION AND SPECIFICATIONS
READY FOR THE FIELD











